Construction and EPC work is unforgiving: dispersed sites, weak connectivity, multi-party sign-offs, and tight budgets. Prime RP is built for exactly this — weighted WBS progress, layered approvals, requisitions, and offline-first field capture, with communication on every record.

What makes construction hard

  • Work happens on sites with poor or no connectivity.
  • Progress is weighted and sequenced across many work packages.
  • Every package needs multi-party quality and approval sign-off.
  • Materials must be requisitioned and tied to budget.
  • Evidence — photos, video — matters for claims and disputes.

How Prime RP fits

The platform maps directly onto contracting reality:

  • Weighted WBS: activities and sub-projects with computed, approval-driven progress.
  • Offline field reports: capture with photo/video/audio, queue without signal, sync later.
  • Layered approvals: engineer → QA → director with reject-to-step and SLAs.
  • Material requisitions: raised against activities, routed, and committed to budget.
  • Communication in context: approve and discuss from the project channel or a call.

The outcome

One system from site to sign-off means project percentages you can trust, an audit trail for every decision, and spend that stays tied to the work — without juggling a chat app, a meeting tool, spreadsheets, and email.

Bottom line

For construction and EPC, Prime RP replaces a stack of disconnected tools with one operational ERP that already understands weighted progress, offline field work, layered approvals, and requisitions.