Core · Projects & Activities

Structure work the way it really breaks down.

Model projects as a proper work-breakdown structure: activities, weighted sub-projects, sequences, and multi-step approval per package. Progress is computed from approved weight, so a project percentage actually means something.

WBSactivities → weighted sub-projects
Computedprogress from approved weight
Per-stepapproval on every package
Drag to rotate
Prime RP Projects & Activities
🏗️ Projects & Activities Activities Sub-projects Approvals Sequence Team Details SG26-PEEG001 · Activities Construction · 12 sub-projects Submit ready packages CNS-001 Foundation (12%) Approved CNS-002 Columns (10%) In review CNS-003 Slab (14%) Draft Project progress 82% Default approval template 3 steps

Illustrative interface — a weighted WBS with per-package approval status.

What makes it different

Projects that add up.

🧱

Activities & sub-projects

Break each project into activities and weighted sub-projects (WBS items) with their own sequence and rules.

⚖️

Weighted progress

Every package carries a weight; project completion is the sum of approved weight — honest, not aspirational.

🔗

Prerequisites & sequence

Order work with prerequisites so dependent packages can't be marked done out of sequence.

Approval per package

Each sub-project runs its own multi-step approval, snapshotting the template at submit time.

🌍

Multilingual details

Capture titles and comments per package in multiple languages for cross-border teams.

📊

Live status

Data and approval status roll straight up into the dashboard and reports.

Generic PM tools vs Prime RP

CapabilityGeneric project toolsPrime RP
Weighted WBS progressManual %Computed
Approval per work packageAdd-onNative
Sequence & prerequisitesBasicYes
Tied to finance & procurementNoYes
Multilingual work itemsNoYes

FAQ

Questions, answered

As the sum of approved sub-project weight divided by total weight — so the percentage reflects work that is actually signed off, not self-reported.
Yes. Projects have a default approval template, but an activity or package can override it when it needs a different path.
Yes — procurement and material requisitions reference the same activities, so spend and progress stay connected.